Φ3.5×60m Ceramsite Kiln in Sichuan: Built for Wet Shale and a Tight Site

Φ3.5×60m Ceramsite Kiln in Sichuan: Built for Wet Shale and a Tight Site

Product Parameters

  • Capacity:150,000–180,000 m³/year
  • Raw Material:Ceramsite
  • Equipment Configuration:Raw crusher, dosing feeder, haydite rotary kiln, cooling machine, dust remover, bucket lift, vibratory screener, belt conveyer, control system

Product Details

Quick Facts



WhereSichuan, China
When2024
WhatΦ3.5×60m ceramsite rotary kiln + full line
Output150,000–180,000 m³/year
Key number12% less fuel, 165,000 m³ in year one

The Feedstock Was Wet and Unpredictable

Sichuan shale and clay. Moisture around 18–22%. Plasticity that changed batch to batch. The customer needed ceramsite that would expand properly—not over-burn, not under-fire—and they needed it on a site that didn‘t have much room.

Their old setup used more coal than they wanted and still struggled with inconsistent pellet quality before the kiln.

What We Built

A complete line around a Φ3.5×60m rotary kiln. The process: crush, batch, mix, pelletize, dry, preheat, calcine, cool.

The parts that solved their problems:

  • Three-stage preheater using kiln exhaust gas—this is where the 12% fuel savings came from

  • Variable speed drive (0.5–2.5 r/min) so operators can adjust when feedstock moisture shifts

  • Dam ring and segmented lifters in the expansion zone to hold pellets at temperature longer

  • L-shaped layout to fit the narrow site, with pelletizing right next to the kiln feed end

  • PLC control with trend logging—operators can see what happened, not just what’s happening

From Contract to Stable Output

Signed early 2024. Sixty days to manufacture. Full assembly and no-load test before shipping. Our engineers spent twenty days in Sichuan—installation oversight, commissioning, and training. Stable production came within three weeks.

Numbers That Matter


TargetActual
Annual output150,000 m³165,000 m³
Bulk density500–700 kg/m³520–680 kg/m³
Coal consumption38 kg/t33.5 kg/t
Kiln uptime85%90%

The customer put it simply: “Less coal, more consistent pellets. That’s what we needed.”

Why Henan Hongke Heavy Machinery

Rotary kilns, Rotary Dryers, ball mills, crushers, and the lines that connect them. One-stop solution, turnkey delivery. We build for your material and your site—not for a spec sheet.

Questions We Get Asked

My shale is wetter than 22%. Can this line handle it?Probably, but the preheater and dryer sizing change. Send us a sample and we‘ll tell you what needs adjusting.

How do you keep the expansion consistent?Temperature control in the expansion zone, plus residence time. The dam ring and variable speed drive give operators room to adjust. PLC trends help them see drift before it becomes a problem.

Lead time?About 60 days for this configuration. Longer for custom layouts or special refractories.

Got a ceramsite project in mind? Send us your feedstock specs and site plan. We’ll tell you what we‘d build and what it would cost. Straight answers, no sales script.



We're Ready to Support Your Next Project

  • ✅ 2000+ projects delivered across 150+ countries
  • ✅ ISO 9001 & CE certified
  • ✅ 100% factory inspection before shipment
  • ✅ 12-month warranty with global after-sales support

Tell us about your application requirements, site conditions, or technical challenges. Our engineers will review your needs and respond within 24 hours with a tailored recommendation — no obligation, just expert advice.

Send Inquiry To Us